Guides / System Design & Sizing

12V, 24V or 48V? Picking Your System Voltage

Why system voltage matters, how it changes the current and cable size, and which voltage suits a shed, workshop or home.

Before you buy a battery, an inverter or a charge controller, you need to pick your system voltage. Almost everything else has to match it, so it's one of the first decisions in any off-grid or backup system.

1. Why voltage matters: it's all about current

Power is volts times amps. For the same power, a higher voltage means less current. Less current means thinner cable, smaller fuses and less energy lost as heat in the wiring.

Those figures are before inverter losses, so the real battery current is a little higher again. At 167A you need very heavy cable and every connection has to be perfect. At 42A the wiring is far easier to handle.

2. When 12V makes sense

12V gear is cheap and easy to find, because it's what caravans and 4WDs use. If that's your world, see Wired For The Wild.

3. When 24V makes sense

4. When 48V makes sense

A 48V lithium bank charges to the high 50s of volts, which is still classed as extra-low voltage DC. It can still deliver a huge current into a short circuit, so it needs proper fusing and isolation (see Fuses, Breakers and Isolators for 12V to 48V Solar).

5. Watch the panel side too

Panels wired in series add their voltages together. A string of panels can easily reach well over 120V DC, which is no longer extra-low voltage and can give a dangerous shock. Check the open-circuit voltage on each panel's label, and check it against your charge controller's maximum input voltage, allowing for the voltage rising on cold mornings.

6. A simple way to decide

  1. Work out the biggest load you'll run through the inverter at once.
  2. Up to about 1,500W: 12V is usually fine.
  3. About 1,500 to 3,000W: 24V is usually the better choice.
  4. Over about 3,000W, or a system that will grow: go 48V.

Whatever you pick, buy the battery, inverter and charge controller to match. Changing system voltage later usually means replacing most of them.

Safety: in Australia, any work on 240V AC wiring, including connecting an inverter, battery or solar system to a home's switchboard or fixed wiring, must be done by a licensed electrician. Grid-connected systems also need approval from your electricity network.

← Back to all guides

↑